The concrete pour started 'in the clouds' on a cool Monday as a low moved across the region. It took five cement trucks (43 yards of concrete) and a crew of six to complete the footings and slab.
The building erection crew put up the 'red iron' on Wednesday. The three man crew is expecting to complete the job in five days with additional structural details, sheeting, windows, doors, and vents.
After ten years of looking at this blank space....I am in awe of the building size and potential!
Our Ag building is 40 feet by 40 feet; eaves are 16 feet with a roof peak of 22 feet. Roof pitch is 4:12 and faces south to take advantage of a future 'off grid' solar installation.
The building erection crew put up the 'red iron' on Wednesday. The three man crew is expecting to complete the job in five days with additional structural details, sheeting, windows, doors, and vents.
After ten years of looking at this blank space....I am in awe of the building size and potential!
Our Ag building is 40 feet by 40 feet; eaves are 16 feet with a roof peak of 22 feet. Roof pitch is 4:12 and faces south to take advantage of a future 'off grid' solar installation.